Welcome to the UK Centre for Mould Safety
- Lisa Malyon
- Oct 1
- 2 min read
Hello,
Welcome to the UK Centre for Mould Safety. We’ve been motivated by the incredible response to our launch on Monday, and we’re delighted to have you with us.
Our service is designed to support both members of the public and professional service providers with clear, practical, and standardised guidance on how to assess, manage, and remediate mould safely.

We are publishing a series of step-by-step task sheets, beginning with:
Equipment and Method
em0 - Risk assessment
em1 - Personal Protective Equipment (PPE)
em2 - Respiratory Protective Equipment (RPE)
em3 - Containment: Enclosures, Sheeting, Pressure Differentials
em4 - Air Filtration and Negative Air
em5 - Decontamination Units and Hygiene Protocols
em6 - HEPA & H-Class Vacuum Systems
em7 - Wet Cleaning / Damp Wiping
em8 - Abrasive / Surface Removal Methods
em9 - Waste Handling and Packaging (Bagging, Sealing, Labelling)
em10 - Verification & Sampling
Task Sheets
M0 – Introduction and how to use the task sheets
M1 – Visual assessment and moisture mapping
M2 – Air and surface sampling (& when justified)
M3 – Pre-remediation occupant and worker protection
M4 – Setting up Containment: Single Room, Domestic Scale
M5 – Setting up Containment: Multi-Room, Commercial Projects
M6 – Installing Negative Air Pressure and AFDs
M7 – Establishing Worker Decontamination Units
M8 – Entry/Exit Protocols for Contaminated Zones
M9 – Temporary Ventilation/HVAC Isolation Prior to Work
M10 – HEPA Vacuuming of Contaminated Surfaces
M11 – Damp Wiping of Non-Porous Surfaces
M12 – Removal of Porous Materials
M13 – Cleaning Semi-Porous Materials
M14 – Cleaning Structural Wood (Sanding, Brushing, Blasting)
M15 – Remediation of Crawlspaces and Basements
M16 – Remediation in Lofts and Attics
M17 – Bathroom and Kitchen Remediation (High Humidity Zones)
M18 – Ventilation & Extraction Systems Hygiene (TR/19 Aligned Summary)
M19 – Sorting and Handling Contents: Clean, Cleanable, Discard
M20 – Cleaning Non-Porous Contents (Hard Goods, Plastics, Metals)
M21 – Cleaning Semi-Porous Contents (Unfinished Wood, Composites)
M22 – Disposal of Porous Contaminated Contents
M23 – Packaging and Transporting Contaminated Waste Safely
M24 – Visual Inspection Standards for Clearance
M25 – Surface Verification Sampling
M26 – Air Verification Sampling
M27 – Clearance Reporting and Re-Occupancy Criteria
This is the UK’s first attempt to standardise advice on mould remediation in a way that protects health, ensures competence, and raises the bar across the industry.
We’ll keep you updated as each new guide is released, along with news, events, and opportunities to help shape this incredibly important work.
Explore more and stay involved at www.ukcms.org
Thank you for being part of this movement towards safer, healthier buildings.
Warm regards,The UKCMS Team

If you haven't already, subscribe to www.indoorairaware.co.uk for more indoor air support
.jpg)
.png)
.png)

Comments